From mboxrd@z Thu Jan 1 00:00:00 1970 From: Roland Everaert Subject: clocktable - summing time on a property instead of headline Date: Fri, 16 Sep 2016 12:56:10 +0200 Message-ID: Mime-Version: 1.0 Content-Type: multipart/alternative; boundary=001a11411a3e6e4c49053c9dcf47 Return-path: Received: from eggs.gnu.org ([2001:4830:134:3::10]:34174) by lists.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1bkqpa-0000SC-2k for emacs-orgmode@gnu.org; Fri, 16 Sep 2016 06:57:18 -0400 Received: from Debian-exim by eggs.gnu.org with spam-scanned (Exim 4.71) (envelope-from ) id 1bkqpV-0007ki-2B for emacs-orgmode@gnu.org; Fri, 16 Sep 2016 06:57:17 -0400 Received: from mail-lf0-f43.google.com ([209.85.215.43]:36718) by eggs.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1bkqpU-0007kM-Rj for emacs-orgmode@gnu.org; Fri, 16 Sep 2016 06:57:13 -0400 Received: by mail-lf0-f43.google.com with SMTP id g62so58984429lfe.3 for ; Fri, 16 Sep 2016 03:57:12 -0700 (PDT) List-Id: "General discussions about Org-mode." List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , Errors-To: emacs-orgmode-bounces+geo-emacs-orgmode=m.gmane.org@gnu.org Sender: "Emacs-orgmode" To: emacs-orgmode --001a11411a3e6e4c49053c9dcf47 Content-Type: text/plain; charset=UTF-8 Hi, I am treating multiple tasks that can belong to the same project or different project, but as I have an (almost) infinite number of projects and I am working on many projects throughout the day, I prefer to define a property that will contain the project code instead of a tree for each project. Thus, is it possible to configure a clock table to display time spend on a property instead of a headline. Thanks, Roland. --001a11411a3e6e4c49053c9dcf47 Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable
Hi,

I am treating m= ultiple tasks that can belong to the same project or different project, but= as I have an (almost) infinite number of projects and I am working on many= projects throughout the day, I prefer to define a property that will conta= in the project code instead of a tree for each project.

Thus, is it = possible to configure a clock table to display time spend on a property ins= tead of a headline.


Thanks,


Roland.
--001a11411a3e6e4c49053c9dcf47--